ENP has completed many assignments across solar, substations, distribution networks and HV and EHV lines, for central public sector undertakings, development authorities and industry.

GAIL Vijaipur: 1.8 MWp ground mounted solar PMC
PMC for a 1.8 MWp captive ground mounted solar plant: design, construction supervision and commissioning.
1.8 MWp · 2019 to 2026
GAIL Pata: 2.64 MWp rooftop solar PMC
Full PMC for rooftop solar in two phases, with a 10 year O&M contract and CUF and PR monitoring.
2.64 MWp · 2021 to 2024
Freewings Power and Infra: 6 MWp solar, Ujjain
6 MWp solar plant with a 33 kV substation, with power sold through the exchange under open access.
6 MWp solar with 33 kV substation · 2022 to 2023
Porwal Auto Components: captive solar plants, Ujjain
Project Management Consultant and Techno-legal Consultant for the captive solar plants wheeling power to the Pithampur works.
30 MWp solar park planned · 2018 to 2023
Indore Smart City: 100 MW Jalood DPR and 2.059 MW solar PMC
DPR for a 100 MW solar plant at Jalood, and PMC for a 2.059 MW ground mounted plant.
100 MW (DPR); 2.059 MW (PMC) · 2018 to 2023
Jaideep Ispat and Alloys: solar plant with 33 kV connection, Dhar
3.3 MWp solar plant, phase 1 of two, connected through a new 33 kV line and substation.
3.3 MWp solar, phase 1 of a two phase project; 0.415/33 kV · 2020 to 2022
Prem Textiles: 1 MWp rooftop solar, Barwah
Feasibility study and PMC for a 1 MWp rooftop plant, with a study of the existing distribution system.
1 MWp (1,000 kWp) · 2021 to 2022
MP Audyogik Kendra Vikas Nigam: electrification of industrial areas
Energy advisor for the external electrification of new and existing industrial areas.
2013 to 2018UltraTech Cement, Sidhi: export of 100 MW at 132 kV
Approval for export of 100 MW of power at 132 kV, wheeling, and open access without contract demand.
100 MW export at 132 kV · 2025 to 2026Military Engineering Services: 825 kWp on-grid solar, Ladakh
Design and estimates for an on-grid ground mounted solar plant at Chumathang, Ladakh.
825 kWp · 2024 to 2026Nathdwara Temple Board: electrical redesign, Shreenathji Temple
Retrofit, reorganisation and redesign of the electrical installation at Shreenathji Temple.
2019 to 2026NTPC Hazaribag: 33 kV line route survey
Route survey for a 33 kV line along the CHP corridor from the Pakri Barwadih 220/33 kV substation.
33 kV · 2025Indore Development Authority: 11 kV upgrade of a 30 year old building
Redesign and upgrade with an 11 kV compact substation, DG, bus duct, wiring, CCTV and fire systems.
11 kV · 2025Narmada-Gambhir Link: HV and EHV power supply
Survey of HV and EHV cables and lines, and 132 kV pump station connections for the Narmada-Malwa Gambhir Link.
11/132/220 kV · 2015 to 2020PTC India for HPCL Visakhapatnam: 220 kV route survey
Detailed route survey for a 220 kV overhead and underground link, 40 km.
220 kV, 40 km · 2015 to 2017MPAKVN (I) Ltd: power distribution for the Indore SEZ, Pithampur
Power distribution for the Indore SEZ as deemed distribution licensee: DPR, licence, power procurement, MPERC petitions, and operation and maintenance.
33/11/0.4 kV · 2010 to 2017Megha Engineering: 132/33 kV and 33/6.6 kV substations, Barwah
Design, estimation and commissioning supervision of a 132/33 kV 40 MVA substation and 33/6.6 kV substations.
1 x 40 MVA 132/33 kV; 2 x 12.5 MVA and 1 x 15 MVA 33/6.6 kV · 2013 to 2014Older assignments
Satya Infrastructures: Malwa County township, Indore
Underground external electrification of the 130 ha Malwa County township.
130 ha township · 2010 to 2014DMIC Vikram Udyogpuri: power distribution, Ujjain
Power distribution for the 80 MW industrial township.
80 MW, 132/33/11/0.4 kV · 2011MERC: conditions of licensee for the Panvel SEZ
Appointed by MERC as consultant to specify the conditions of licensee for the Panvel SEZ.
2011Dewas water supply: 60 km 33 kV line
A 60 km 33 kV line and three 33/0.4 kV substations for the Dewas water supply scheme.
33 kV, 60 km · 2010MIDC: Barvi hydro project DPR
DPR and tender documents for a 2 x 2.5 MW small hydro plant on the Barvi river.
2 x 2.5 MW · 2008MIDC: Hinjawadi Phase 3 underground electrification
DPR and tender documents for underground electrification of Hinjawadi Phase 3, Pune.
2008IGC Golconda Township, Indore: underground electrification
Design and consultancy, and later the erection, of a 5000 kVA substation and underground cabling for the township.
5000 kVA, 33/11/0.4 kVOngoing assignments
Listed here while the work is in progress. Each gets its own page when it completes.
| Client | ENP’s work | Capacity | Since |
|---|---|---|---|
| Oil India Ltd | PMC, captive solar plant at Jaisalmer, Rajasthan | 1.3 MWp | 2025 |
| Indraprastha Gas Ltd, New Delhi | EPC bid process management and PMC, solar on agricultural land, Delhi region | 28 MWp | 2025 |
| GAIL (India) Ltd, Visakhapatnam | PMC, rooftop and ground solar | 500 kW | 2024 |
| HPCL Renewable and Green Energy Ltd | DPR and feasibility study for solar and battery storage plants at HPCL locations in Gujarat and Rajasthan | 21 MWp | 2026 |
| HPCL Renewable and Green Energy Ltd | Plant sizing, DFR and EPC tender, solar plants in several states | 2026 | |
| HPCL Renewable and Green Energy Ltd | PMC, net metering LSTK solar at Karnataka locations | 538 kWp | 2024 |
| J&K Bank, Srinagar | Engineering consultancy, rooftop solar at corporate headquarters | 200 kWp | 2026 |